Planning a Kitchen Renovation in Pietermaritzburg: When to Bring in the Stone Fabricator

Table of Contents

Picture of Rudi Hohls

Rudi Hohls

Rudi Hohls is the owner of Allstone Solutions, a stone fabrication and installation company at 70 Winston Road, Pietermaritzburg. He and his team fabricate and install granite, marble, quartz, onyx and sintered stone countertops, vanities and features for homes and businesses across KwaZulu-Natal.

Ready for a Free Stone Countertop Quote?

Allstone Solutions measures, fabricates and installs granite, marble, quartz and onyx in Pietermaritzburg and across KwaZulu-Natal. Send us your plans or measurements and we will come back with a quote.

When to bring a stone fabricator into a Pietermaritzburg kitchen renovation, what to have ready for templating, and how to keep the countertops from delaying the project.

Bring your stone fabricator into a kitchen renovation twice. The first time is at the planning stage, before you sign off the cupboard layout, so the stone, the sink, the hob and any island overhang are planned together. The second time is for templating, once the cupboards are installed, fixed and level, and the sink, hob and taps are on site. Get those two moments right and the rest of the project usually falls into place.

We fabricate and install granite, marble, quartz and sintered stone countertops from our workshop at 70 Winston Road in Pietermaritzburg, and most of our kitchens are done alongside a kitchen company, a plumber and an electrician. This guide walks through a renovation in the order the work actually happens, and shows where the stone fits in at each stage. If you already have a plan, you can send it to us for a free quote before you read on.

The Two Moments to Call Your Stone Fabricator

1. At the planning stage

Call while the layout is still on paper. At this point a short conversation can still change things cheaply: where joins will fall on a long run, whether an island needs a steel support for seating, how wide the cupboard under an undermount sink needs to be, and whether the slab you like is big enough to do your island in one piece. It is also the right time to choose your stone. Our stone selection consultation lets you see full slabs rather than small samples, and our guide to kitchen countertop materials compares the options side by side.

2. When the cupboards are in and level

Templating is when we measure the installed cupboards and record the exact shape of every countertop, cut-out and edge. Because the stone is cut to those measurements, the cupboards must be fixed in their final position and level before we arrive. If a cupboard moves after templating, the stone will not fit, and the templating has to be done again.

Shaker-style kitchen cupboards with stone countertops installed by Allstone Solutions
A shaker-style kitchen with stone countertops by Allstone Solutions.

Your Kitchen Renovation Timeline, Stage by Stage

Every kitchen renovation in Pietermaritzburg is a little different, but the order below works for most homes. The stone stages are in bold so you can see where we come in.

Stage 1: Budget, layout and stone choice

Set your budget, settle the layout with your kitchen company and choose your stone. Material, thickness, edge profile and the number of cut-outs all change the price, so a quote at this stage helps you see whether granite, quartz or sintered stone fits your budget before anything is ordered.

Stage 2: Choose your kitchen company or cabinet maker

Tell your kitchen company which stone you plan to use. Stone is heavy, so the cupboards need solid carcasses and enough support where the top spans a gap, such as over a dishwasher. If you want an island with seating, decide now how far the top will overhang, because a large overhang needs hidden support built in. Our article on granite kitchen island designs has layout ideas.

Stage 3: Choose your sink, hob, taps and appliances

This is the step most renovations leave too late. We need the actual sink and the hob model to cut the openings, because cut-out sizes differ between brands and models. Decide early whether you want an undermount sink, a butler sink, a drop-in sink or an integrated stone basin, and where the tap and soap dispenser holes go. If you are considering burners set straight into the stone or a hob hidden under the countertop, read about PITT cooking and Induction Pro installation before your cupboards are ordered.

Stage 4: Demolition and first-fix plumbing, electrics and gas

Old units come out, and the plumber, electrician and gas installer run new pipes and cables to the right positions. Use registered trades. Electrical additions and alterations need a certificate of compliance from a registered person under the Electrical Installation Regulations, 2009, and a gas hob must be installed by a registered gas installer who issues a Certificate of Conformity, as Defy explains in its gas hob FAQ. For plumbing, ask for a plumber registered with the Plumbing Industry Registration Board (PIRB).

Stage 5: Cupboards installed, fixed and level

Your kitchen company installs the units. Before you book templating, check that every cupboard is screwed to the wall and to its neighbours, that the tops of the carcasses are level, and that any support for an overhang or a heavy sink is in place.

Stage 6: Templating

We visit, measure the installed cupboards and record every edge, wall, cut-out and overhang. Have the sink, hob and tap on site, and be there yourself if you can, because this is when final decisions are confirmed: where the joins go, which edges are exposed and get a polished profile, and how far the top overhangs at the ends. You can see the edge options on our designs page.

Country kitchen in Karkloof with African Ivory granite countertops and a gas hob cut-out
African Ivory granite in a Karkloof country kitchen. The hob and sink openings were cut to the exact appliances on site.

Stage 7: Fabrication in our workshop

The slabs are cut to the templates in our workshop, the cut-outs are made, the edges are shaped and polished, and joins are planned so the pattern flows. You can read more about how we work on our stone fabrication page.

Stage 8: Installation day

Our own installation team delivers and fits the tops, sets undermount sinks, bonds and finishes the joins, and seals the edges against the wall. Clear the kitchen and the route from the front door, and let us know about stairs, narrow passages or a long carry, because stone slabs are heavy and need room to manoeuvre.

Stage 9: Splashbacks, tiling and final connections

Splashback tiles go on after the stone is in, so they sit neatly on the countertop. Then the plumber connects the sink and taps, the gas installer or electrician connects the hob, and the appliances go back in. Ask each trade for its certificate before you make the final payment.

What Usually Delays the Countertops

In our experience, most delays on a kitchen renovation come from a handful of avoidable problems:

  • Cupboards not fixed or not level when we arrive to template.
  • The sink or hob not on site, so the cut-outs cannot be measured.
  • Layout changes after templating, such as moving a cupboard or swapping the hob for a different model.
  • The splashback tiled before the stone goes in, which leaves an uneven line along the wall.
  • The stone not chosen in time, so the slab is not reserved when fabrication is ready to start.
  • Old countertops still in place, with nobody arranged to remove them.

Thinking about keeping your old tops and covering them? Read whether granite can go over an existing countertop first.

Working With Your Kitchen Company

Many of the kitchens in our residential projects were done together with Pietermaritzburg and Midlands kitchen companies and cabinet makers. The renovations that run smoothly have three things in common:

  1. One shared plan. The kitchen company, the plumber and the stone fabricator all work from the same drawing, with the sink and hob models written on it.
  2. A clear handover. The kitchen company tells you, or us, as soon as the cupboards are fixed and level, and only then is templating booked.
  3. Someone in charge. Whether it is you, your builder or the kitchen company, one person keeps the dates and passes on changes.
Planning a Kitchen Renovation in Pietermaritzburg When to Bring in the Stone Fabricator
A Curries Post kitchen with 30 mm Proquartz tops and a butler basin.

Living Without a Kitchen: A Few Practical Tips

  • Set up a temporary kitchen in another room with a kettle, a microwave, an air fryer or a two-plate stove, and a small table.
  • Keep a basin or the laundry sink free for washing up.
  • Cook and freeze a few meals before demolition starts.
  • Ask your plumber whether the sink can be temporarily reconnected while you wait for the countertops.
  • Keep the dates for templating and installation on the fridge, so everyone in the house knows when the kitchen must be clear.

Checklist Before You Book Templating

  • Stone chosen and slab reserved.
  • Cupboards installed, fixed to the wall and level.
  • Support for overhangs, islands and heavy sinks in place.
  • Sink, hob and taps on site, with the hob’s installation manual.
  • Positions of tap holes, soap dispenser and plug points decided.
  • Edge profile and splashback height decided.
  • Old countertops removed, or removal arranged.

Frequently Asked Questions

When should I contact a stone fabricator during a kitchen renovation?

Contact us while the layout is still being planned, so the stone, sink, hob and any overhangs are designed together. Book templating later, once the cupboards are installed and level.

Do the cupboards have to be installed before templating?

Yes. We measure the installed cupboards, not the plan, so they must be fixed in their final position and level. Measuring from a drawing risks a countertop that does not fit.

Do I need my sink and hob before templating?

Yes. Cut-out sizes vary between brands and models, so we measure from the actual sink and hob, or from the manufacturer’s installation template.

How long does the stone part of a renovation take?

It depends on the stone, the size of the kitchen, how many cut-outs there are and how busy the workshop is at the time. We confirm dates when you accept your quote, and again after templating, so you can plan the other trades around them.

Which stone is best for a renovated kitchen?

Granite is very heat-resistant and hard-wearing, quartz is low-maintenance and consistent in colour, and sintered stone suits outdoor and heavy-use areas. Our granite and quartz and engineered stone pages explain each option.

Planning a kitchen renovation in Pietermaritzburg or the Midlands? Send us your plan, a few photos and the stone you have in mind through our quote form, or call us on 033 345 7889, and we will help you plan the stone around the rest of your project.

Share This :